Date difference
Days between two dates, working days, or a date some days away.
PrivateNo uploadsRuns in your browserToday
Type an end date to see the days between. Press Example to try one.
How it is calculated
Each date is turned into a plain day number on the calendar, so the gap is a simple subtraction and clock changes never add or lose a day.
days = end day number − start day number (+ 1 when the end date is included)
Months are counted by stepping forward one month at a time from the start date. When a month has no matching day, the last day of that month is used, so 31 January plus one month is 28 February (29 in a leap year). Working days go through the range day by day, leaving out Sundays, the Saturdays your rule says, and your holidays.

For the days that matter
Count every day to the big one
The wedding countdown. Days left to the wedding. Every family member knows.
BeforeFlip the calendar, count the squares
With sdevPick two dates, see days and weeks

Our first year
How many days since the wedding? Now he knows.

Plan the trip
Leave on this date, come back on that one. Done.
How to count days between dates
Pick the two dates
Type them as dd/mm/yyyy or use the calendar. The start date begins at today.
Choose what counts
Tick Include the end date if both days count. Set the Saturday rule and paste holidays for working days.
Read or add
See days, weeks, months and years. Switch to Add or subtract to find the date a number of days, weeks or months away.
Good to know
- Banks and many offices close on the second and fourth Saturdays. Pick that rule to match.
- Notice periods and leave are often counted with both dates. Tick Include the end date for those.
- Typing 01082026 with no slashes works too; it is read as 01/08/2026.
- Copy link keeps the dates and options in the address. The holiday list stays on this page only.
- Ctrl+C with nothing selected copies the whole result.
Where people use it
Notice period at work
Add 30, 60 or 90 days to your resignation date to find your last working day.
Count working days
Leave out Sundays, Saturdays and holidays to count real working days for a project or a bill.
Second and fourth Saturday
Banks and offices that close on the 2nd and 4th Saturday are handled for you.
Days to a big event
See how many days, weeks and months are left to a wedding, an exam or a trip.
Age on a date
For an exact age from a date of birth, the age calculator is quicker.
Age calculator
Why this one
It knows the second and fourth Saturday rule and lets you add your own holidays, so the working day count matches a real office.
- Days, weeks, months and years in one answer.
- Working days with your own Saturday rule and holidays.
- Add or subtract days, weeks, months or years.
- Copy or share the result.
What you can change
- Between two dates or add and subtract
- Include the end date
- Sundays off
- Saturday rule
- Holiday list
People find this page by searching
- days between dates
- date difference calculator
- days calculator
- working days calculator
- add days to date
- how many days until
- 90 days from today
- business days between two dates
- weeks between dates
- notice period calculator
Cite this tool
- APA
sdev.in. (n.d.). Date difference calculator [Web tool]. https://www.sdev.in/tools/date-difference
- MLA
"Date difference calculator." sdev.in, https://www.sdev.in/tools/date-difference.
- Chicago
sdev.in. "Date difference calculator." https://www.sdev.in/tools/date-difference.
- BibTeX
@misc{sdev-date-difference, title = {Date difference calculator}, author = {{sdev.in}}, howpublished = {\url{https://www.sdev.in/tools/date-difference}}, note = {Web tool} }
Questions people ask
Does the count include the start and end dates?
By default it counts the days from the start date up to the end date, the way a calendar does: 1 to 2 August is 1 day. Tick Include the end date to count both days, which gives 2. Leave notices and rental days often count both.
How are working days counted?
Every day in the range is checked. Sundays are left out, Saturdays follow the rule you pick (all off, second and fourth off, only the second off, or all working), and any holiday you paste is left out too.
What happens when I add a month to 31 January?
You get the last day of February (28th, or 29th in a leap year), because February has no 31st. Adding months never spills into the next month.
How do I add a holiday list?
Paste one date per line, such as 26/01/2026 or 2026-01-26. A name after the date is fine, like 15/08/2026 Independence Day. Holidays that fall on a day already off are not counted twice.
Are time zones or daylight saving a problem?
No. Only calendar dates are used, never clock times, so the count is the same wherever you are.